Blackheath, Greenwich and much of South East London are full of Georgian and Victorian houses, and a lot of them are either listed or sit in a conservation area. That is a big part of their appeal. It also means the rules on what you can change are stricter, approvals take longer, and the features that make the house special are the easiest to damage if the work is not planned properly.
Many homeowners only find this out once they have bought the house or had drawings done. We have set up a dedicated listed buildings and conservation areas service for exactly these projects, and this guide covers what you need to know before you start.
Is your house listed or in a conservation area?
It is worth checking before you plan anything. Listed buildings are recorded on Historic England’s National Heritage List for England, which you can search online. Conservation areas are set by your local council, and most publish maps on their website. Some streets also have Article 4 directions, which remove permitted development rights for smaller changes. If you are not sure, we confirm all of this at the first visit.

What listing actually means
Listing protects the whole building, inside and out, not just the front elevation. That includes original joinery, staircases, fireplaces, plaster work and later additions that have become part of its history. Most listed homes in London are Grade II.
Any work that affects the character of a listed building needs listed building consent from the council, on top of planning permission and Building Regulations where they apply. Carrying out that work without consent is a criminal offence, and the owner remains liable even if it was the builder who did it. This is not an area to cut corners.
What changes in a conservation area
If your house is not listed but sits in a conservation area, the building itself is less protected, but a lot of work that would normally be permitted development needs full planning permission instead:
- Roof extensions such as dormers
- Side extensions, two-storey rear extensions and external cladding
- Smaller changes such as windows, doors, front walls and roof lights, where an Article 4 direction applies
- Demolishing most buildings, or walls above a certain height
- Work to most trees, which needs six weeks’ notice to the council
The council will also expect the design to suit the street, from the roof form and the brick to the proportions of the windows.

Why these projects need design and build working together
On a listed or conservation area project, the design has to satisfy the conservation officer and still be buildable on site. A drawing that gets approved but cannot be built as drawn means going back to the council for amendments, and that costs months. That is why we start every project with the design and keep the same team through to the build.
In practice, that means:
- Surveying and recording what is there before any design is fixed
- Repairing original fabric where possible rather than replacing it
- Using compatible materials such as breathable lime mortars, natural slate and timber windows
- Balancing Building Regulations, such as insulation and fire safety, with what the building can take
- Agreeing details with the conservation officer before work starts, not after
A recent example
On a Grade II listed Georgian end-terrace in East London, the front elevation had to stay exactly as it was. We stabilised cracked flank walls with helical bars and brick stitching, repointed in lime mortar, and added a dormer loft and a rear kitchen extension without touching the protected front.
Closer to home, we have built extensions in the Blackheath conservation area, including a full-width rear kitchen extension and a wraparound extension and full renovation, both designed to sit comfortably with the original houses.
We design and build period home projects across South East, Central and East London, from the first survey and consents through to handover.
Start your project →How we handle a listed or conservation area project
- A survey and record of the existing building
- Design drawings developed with the conservation constraints in mind from day one
- Planning and listed building consent applications prepared and submitted for you
- Structural design by chartered structural engineers in our design team
- Detailed construction drawings, so conservation details are resolved before work starts rather than on site
- Discussions with the conservation officer handled by us
- The build, by our own team, with building control through to final sign-off
We will always be straight with you about timescales and chances. Listed building consent and conservation area applications usually take longer than a standard planning application, and no one can promise what the council will decide. What we can do is design with the council’s expectations in mind from the start, which gives your application its best chance.
Related reading
- Technical case study: Grade II listed Georgian house renovation
- Case study: Georgian house renovation in Greenwich, SE10
- Case study: wraparound extension in the Blackheath conservation area
- Design and build: why your project should start with the design
- Renovating a leasehold property in London
Thinking about a project on a period home?
If your house is listed or in a conservation area in South London or Central London, talk to us before you commit to a design. Tell us about your project below and we will get back to you.
Start your project